Project process
Clear inputs, transparent results and defined approval points connect your requirement with engineering and manufacturing at ENITOR.
Five phases
Each phase clarifies the required inputs, the result delivered by ENITOR and the status approved together.
Phase 01
Phase 02
Phase 03
Phase 04
Phase 05
Preparation
The more complete the available information, the more precisely the task can be assessed.
Frequently asked questions
Send the available information directly or discuss the right starting point with us.
Define the task, constraints and shared project scope.
Coordinate the technical solution and engineering status.
Transfer the approved status into manufacturing.
Verify the agreed criteria transparently.
Coordinate delivery, documents and continued support.
Application, environment, loads, dimensions, interfaces, schedule and available documents.
An agreed requirements profile, documented open points and a reliable feasibility assessment.
Jointly confirmed project scope.
Drawings or CAD data, relevant standards, contacts and technical priorities.
Concept, engineering, material and surface definition plus project-specific documents.
Engineering approval.
Confirmed revision status and agreed delivery parameters.
Manufacturing documents, material preparation and production of the approved status.
Manufacturing approval or confirmed revision status.
Agreed inspection and acceptance criteria.
Dimensional, functional and execution checks plus the agreed documentation.
Acceptance or delivery approval.
Agreed delivery and handover data.
Packaging, delivery, documents and coordinated continued support.
Documented handover.